Switching/Forwarding delay |
Short forwarding delay: The 100 Mbit/s Ethernet port sends the 64-byte Ethernet packets at a delay shorter than 20 μs. |
BER in full load |
BER of port when transmitting data in full load < 10 e-7 |
System performance |
System |
Redundant configuration |
System availability in typical configuration |
>99.999% |
Mean Time Between Failures (year) |
≈45 |
Configuration |
Maintenance port |
Number of 10 Mbit/s/100 Mbit/s maintenance Ethernet ports: 1 |
Number of serial ports for local/remote maintenance: 1 |
Monitoring port |
Number of environment monitoring serial ports: 1 |
Maximum number of GPON ports in a subrack |
ETSI Chassis: 256 |
Maximum number of 10G GPON ports in a subrack |
ETSI Chassis: 128 |
Maximum number of P2P FE ports in a subrack |
ETSI Chassis: 768 |
Maximum number of P2P GE ports in a subrack |
ETSI Chassis: 768 |
Maximum number of upstream ports (GE ports in the GIU slot) in a subrack |
8 |
Maximum number of upstream ports (10GE ports in the GIU slot) in a subrack |
4 |
Maximum number of ADSL2+ ports in a subrack |
ETSI Chassis:1024 IEC Chassis:896 |
Maximum number of VDSL2 ports in a subrack |
ETSI Chassis:1024 IEC Chassis:896 |
Maximum number of EFM SHDSL ports in a subrack |
ETSI Chassis:512 IEC Chassis:448 |
Maximum number of TDM SHDSL ports in a subrack |
ETSI Chassis:256 IEC Chassis:224 |
Maximum number of POTS ports in a subrack |
ETSI Chassis:1024 IEC Chassis:896 |
Maximum number of ISDN BRA ports in a subrack |
ETSI Chassis:256 IEC Chassis:224 |
Maximum number of ISDN PRA ports in a subrack |
ETSI Chassis:64 IEC Chassis:56 |
Management ports |
Outband management Ethernet port (RJ-45) |
SCUB/SCUN/SCUF/SCUH control board: 1 Port Per Board |
Local serial port (Console) |
SCUB/SCUN/SCUF/SCUH control board: 1 Port Per Board |
Upstream ports |
GE electrical port |
GICE: 4 Ports Per Board |
GICG: 2 Ports Per Board |
GE optical port |
GICF/GICK: 2 Ports Per Board |
SCUB/SCUN/SCUH/GICD/GSCA: 4 Ports Per Board |
ETHB/SPUA/SPUF: 8 Ports Per Board |
SPUC: 40 Ports Per Board |
10GE optical port |
X2CS/SPUA: 2 Ports Per Board |
SPUC: 4 Ports Per Board |
SPUF: 8 Ports Per Board |
E1 port |
TOPA: 16 Ports Per Board |
STM-1 upstream optical port |
TOPA: 2 Ports Per Board |
PON upstream optical port |
P2CA: 2 Ports Per Board |
Service ports |
GPON port |
GPBD/GPBH: 8 Ports Per Board |
GPFD: 16 Ports Per Board |
10G GPON port |
XGBC: 4 Ports Per Board |
P2P GE optical port |
OPGD/OPGE: Single-fiber bi-directional: 48 Ports Per Board, Two-fiber bi-directional: 24 Ports Per Board |
P2P FE optical port |
OPFA: 16 Ports Per Board |
OPGD/OPGE: Single-fiber bi-directional: 48 Ports Per Board, Two-fiber bi-directional: 24 Ports Per Board |
Ethernet optical port |
ETHB: 8 Ports Per Board |
E1 port |
H802EDTB: 16 Ports Per Board |
ADSL2+ |
ADPD/ADQD/ADKM/ADPE/ADPM |
VDSL2 |
VDRD |
VDMF/VDNF/VDJM/VCMM |
VDPE/VDPM/VDQM/VDPD/VCPE |
EFM SHDSL |
SHLM |
SHGM |
TDM SHDSL |
H802EDTB: 16 Ports Per Board |
POTS |
ASPB : 64 Ports Per Board |
ADSL2+&POTS |
CAME : 48 Ports Per Board |
VDSL2&POTS |
CVME : 48 Ports Per Board |
CCPE : 64 Ports Per Board |
ISDN BRA |
DSRD/DSRE :32 Ports Per Board |
Device Specifications |
Dimensions (W x D x H, including mounting brackets) |
ETSI Chassis: 530.00 mm x 275.80 mm x 447.20 mm |
IEC Chassis: 482.60 mm×275.80 mm×441.70 mm |
Dimensions (W x D x H, excluding mounting brackets) |
ETSI Chassis: 490.00 mm x 275.80 mm x 447.20 mm |
IEC Chassis: 442.00 mm×275.80 mm×441.70 mm |
Maximum weight (including mounting brackets) |
ETSI Chassis: 33 KG |
IEC Chassis: 30.54 KG |
Working environment temperature |
For an indoor cabinet
Configured with 1 subrack: -25°C to +65°C
Configured with 2 subracks: -25°C to +55°C |
Working environment humidity |
5% RH to 95% RH |
Atmosphere pressure |
61 kPa to 106 kPa |
Altitude |
< 4000 m |